I'm looking to remodel the downstairs cloakroom (1 m x 2 m), the master bathroom (2 m x 3 m), and the on-suite shower (3 m x 1.5m) in my house.
Ideally, I'd like to do all three bathrooms one after the other and as soon as possible. In order to be cautious, however, I think it's more prudent to sign contracts one-by-one: with these things one never knows what will happen to the budget.
Received:
From:@yahoo.com
To: info@mogio.co.uk moGio bathroom & wet room
Sent: Thu, 09 December, 2010 16:12:54
Subject: Message from mogio.co.uk
You can request customised estimate now, Contact moGio
...........................................................................................................
In all three rooms, I'm roughly looking to do the following:
Downstairs loo The downstairs loo is 162 cm deep and 78 cm wide (95 cm into the washbasin alcove). It is currently carpeted, and it contains a loo with a cistern and a washbasin. There is a pull chord switch for a ceiling.



Family bathroom

The family bathroom is about 266 cm wide and 204 cm deep. In one corner there is an airing cupboard. There is a pull chord for a ceiling lamp, and the
ceiling is covered with artex.The toilet is mounted in front of panelling (which extends up to the window), presumably to cover the plumbing. There is an
alcove with a washbasin and there is panelling on the floor underneath. The floor is carpeted. The floor plan is shown below.




On-Suite





From: info@mogio.co.uk moGio bathroom & wet room
To: @yahoo.com
Sent: Fri, 10 December, 2010 14:15:34
Subject: Re: Message from mogio.co.uk
Hello,
Thank you for your enquiry. Please find attached estimate.
I am not really sure what kind of units you wish to have but I quoted for basic white painted MDF or so panels painted white. Or so position of suites will change in master bathroom that affected the price slightly. Due to few changes cost of materials and timeline has been affected. I hope you will find the attached estimate competitive.
I look forward hearing from you.
![]()
Estimate 11.12.2010
Bathroom fitting
The downstairs cloakroom (1.62 m x 0.78 m)
Remove toiler, the washbasin, carpet, the ceiling lamp
Alter the plumbing
Change suites in the same position
Build bespoke cupboard and install cupboard underneath the basin
Build panelling behind the loo about 100 cm height, to cover the plumbing and to hide
cistern. Panelling should match front of cupboard underneath the basin.
Install light switch outside
Change lights
Install suites WC & washbasin with chrome trap
Tile alcove above wash basin (about 126 cm)
Tile floor
Pain ceiling
Pain the rest of wall
Keep site clean
Total labour for bathroom £1550.00 + materials
Variable cost of materials £350.00+
Rubbish Removal £30.00
Time of work 9 working days
The master bathroom (2.6 m x 2.4 m)
Remove air cupboard (CH system will be removed by the date project starts)
Remove tiles
Alter the plumbing
Install cupboard into wash basin alcove – build bespoke cupboard
Install WC cover with panels
Install bathtub with a shower
Change suites in the same position
Install cupboard underneath
Install light switch
Change lights to spotlights
Install extractor fan
Install suites
Tile alcove above the basin
Tile above the bath
Tile the floor
Skim ceiling
Pain ceiling
Pain the rest of wall
Finish
Keep site clean
Total labour for bathroom £2350.00 + materials
Variable cost of materials £600.00+
Rubbish Removal £150.00
Time of work 16 working days
On-suite shower (3 m x 1.5m)
Remove tiles, toilet, washbasin, bathtub, wooden floor, the ceiling lamp
Alter the plumbing
Plumbing for shower mixer, head, shower ray
Build in wall hung WC, install frame
Plumbing for bidet
Install extractor fan
Install cupboard underneath
Install light switch outside
Change lights
Install suites in new position according to plumbing and drawing provided
Tile walls 164 cm in height, and walls inside the shower 220 cm height
Tile floor
Skim walls where paint
Pain ceiling
Pain the rest of wall
Keep site clean
Total labour for bathroom £2650.00 + materials
Variable cost of materials £700.00+
Rubbish Removal £100.00
Time of work 18 working days

Please note:
This is not a contract. Contract containing detailed therms and conditions as well as agreements between contractor and
client with works scope will be provided upon estimate acceptance.
![]()
From: @yahoo.com
To: info@mogio.co.uk
moGio bathroom & wet room
Sent: Sat, 11 December, 2010 08:30:12
Subject: Re: Message from mogio.co.uk
Hello,
This is indeed very competitive -- thank you for your quote! I would like to proceed with this quote. I guess it's best we handle this one-by-one. I'd like to start with the downstairs cloakroom, and if everything works well, I'll then do up the other two bathrooms.
Can you please inform me how we would proceed -- i.e., what the next step is?
I'm on holiday until 9th of January, so not much will happen before that. If someone needs to pop by to see the building site first, it would be really good if they could do it on the 11th of January, as I'll have to work from home on that day.
Perhaps it will be easier to discuss in person; I can give you a call if you wish.
Regards,
From: info@mogio.co.uk moGio bathroom & wet room
To: @yahoo.com
Sent: Sat, 10 December, 2010 14:15:34
Subject: Re: Message from mogio.co.uk
Please find attached contract for works.
We must agree on dates, and then I'll fill in rest of builder details.
So please come back to me with dates which I'll discuss with builder.
From: @yahoo.com
To: info@mogio.co.uk
moGio bathroom & wet room
Sent: Mon, 13 December, 2010 11:12:34
Subject: Re: Message from mogio.co.uk
Hello,
Thanks for the contract, I agree to it.
Regarding the dates, here is my proposal:
- survey of the works on 11th of January, upon which the builder will instruct me regarding what else to purchase (tiles, whether there are any requirements on the toilet and/or cistern, etc.)
- commencement of the works on Monday 7th of February.
Please let me know whether that's OK with you.
Regards,
....project will updated soon