We would like to modernise our bathroom and separate toilet. Can we arrange a visit please? It is a very small bathroom but we would like new tiles, floor, ceiling, sink, shower and cupboards. We are in North London so we may be a bit far for you to come. If possible, I would like a consultation. If the quote is reasonable then I would like the 'design, procurement and fit' service.  Please let me know when would be a good time for you next week. I attach a few pictures to give you an idea of what it looks like. The tiles are particularly lovely circa 1980s!

You can request customised estimate now,  Contact moGio

...........................................................................................................

From:  [maito:]
Received: 7 DEC 2010 15:33
To: moGio bathroom & wet room
Subject: Message from mogio.co.uk

WC bathroom make over

basin with pedestal

bath with panel shower

bathroom remodeling

separate small WC

shower room wall

 towel rail bathroom

 

From:  moGio bathroom & wet room
Received: 8 DEC 2010 09:10
To:
[maito:]
Subject: Message from mogio.co.uk

Thank you for  your email.


Please find attached estimate. I hope it will be within your budget.  When it comes to design and procurement this is another service we offer. 1st consultation is free, and £45/h afterwards, normally costs ends up in total £400-500 and savings and final effect is great. We will provie suites and design to meet your budget.
 
Please tell me how estimate suites you and how would you like to take things forward.
 
I look hearing from you.
 
Kind Regards,
Mariusz

Bathroom & Toilet refurbishment estimate 08.12.2010


Remove the existing suite, tiles bath/wc
Remove carpet bathroom/wc
Alter the heating pipes to accommodate a new towel rail – in the same position
Alter the plumbing supplies to accommodate a new basin position/layout
Install a new shower valve
Plumbing for wall stinging WC/o

r if wall hung box for frame needed. No cost increase.
Prepare the walls for full tiling
Prepare box for tile in wall hung WC
Walls in the WC plaster for half tiling
Make ceiling bathroom/wc good
Supply and fit 4 low voltage spot lights bathroom
Supply and fit 2 low voltage spot lights WC
Install shower base
Prepare the floor for tiling, apply plywood bathroom/wc
Tile the floor bathroom/wc
Tile half walls in wc
Fully tile bathroom walls
2nd fix: the shower base, enclosure, basin, WC, cloakroom basin, trap and the towel rail
Shower mixer, head
WC, flush cistern
Fit any accessories
Wall paper in the toilet/or paint no cost increase
Pain ceiling bathroom/toilet
Leave site clean and tidy on a daily basis

Total labor for bathroom £2800,00 + materials + clerance
Materials £ 650,00
Rubbish Removal £150.00
Time of work 16 working days

 

From: [maito:] moGio bathroom & wet room
Received: 12 DEC 2010 14:34
To:
moGio bathroom & wet room
Subject:RE: Message from mogio.co.uk

Dear Mariusz,

I apologise for not getting back to you sooner. We are in the process of getting a few quotes. I am assuming your quote is without the cost of new shower/toilet/sink/taps etc. 

Many thanks.